Skip to product information
1 of 12

Sorano

Wooden Village House

Wooden Village House

Regular price 46,287.36TL
Regular price Sale price 46,287.36TL
Sale Sold out
Taxes included. Shipping calculated at checkout.
Square meters

Our valued customers,

We install our wooden & stone framed houses all over Turkey.

 

FEATURES

* Basic : Our options according to the land situation and customer demand,

-Short pile foundation

-Continuous beam concrete foundation

- Masonry foundation with local rubble stone

 

* Carcass : Our options according to customer preference,

-External wall masonry stone, internal walls wooden, roof wooden

-All wood frame

 

* Roof cover : Shingle coating.

 

* Facade : According to customer preference,

-Natural masonry stone

-Wood

-Insulated Fiber Cement

 

* Inner Walls : According to customer preference,

- Drywall coating, finishing with water-based paint

-Wood veneer

 

* Ceilings : According to customer preference,

- Drywall coating, finishing with water-based paint

-Wood veneer

 

* Floors : Room floor is laminated parquet, other floors are tiled.

 

* Window : PVC profile, white color joinery. Color options are optional.

 

* Entrance door : Wooden material solid door.

 

* Interior doors : Panel door.

 

* WC-Bathroom Space : Shower tray, shower cabin, half-pedestal washbasin, bathroom cabinet, floor-standing toilet..products are included in the package.

 

* Kitchen Space : Mdflam material kitchen cabinet, steel sink, marble countertop are included in the package. Other requests are optional.

 

* Indoor installation : Electricity, water installation is included in the package. Air conditioning and, upon request, heating installation are optionally available.

 

* End elements : Electric and water end elements are offered in the package scope.

 

* Heating : Solid fuel stove or fireplace. Fireplace boiler is optionally available upon request for a fireplace.

 

* Excluded from the package : White goods, sitting groups, wardrobes, coat racks, bed bases, bedsteads, etc. are excluded.

 

 

INFRASTRUCTURE

* Water : It is accepted that there is a network (it has been brought to the base area). A sufficient amount of water tank will be offered optionally for places where there is no network.

 

* Waste water : It has been accepted that there is a sewer line (installed between the foundation-line). In places where there is no sewerage infrastructure, a septic tank will be offered as an option.

 

* Energy : It is accepted that there is an energy line (it was brought to the foundation site). For non-existent places, solar-wind-generator solutions will be offered optionally.

 

 

RECONSTRUCTION

TAKS value will be obeyed.

 

 

PROJECT-FOLLOW

* Project : Foreground-projects will be prepared within our company and submitted to the approval of the Customer. Turning the accepted plans into a Project (Architectural-Static-Electrical-Mechanical Installation) and submitting them to the institution are included in the scope of the package.

 

* Follow-up : Municipality-other Institution follow-up will be done by our company.

 

* Institutional payments : All licenses and payments to Institutions will be made by the Customer .

 

View full details