Sorano
Wooden Village House
Wooden Village House
Couldn't load pickup availability
Our valued customers,
We install our wooden & stone framed houses all over Turkey.
FEATURES
* Basic : Our options according to the land situation and customer demand,
-Short pile foundation
-Continuous beam concrete foundation
- Masonry foundation with local rubble stone
* Carcass : Our options according to customer preference,
-External wall masonry stone, internal walls wooden, roof wooden
-All wood frame
* Roof cover : Shingle coating.
* Facade : According to customer preference,
-Natural masonry stone
-Wood
-Insulated Fiber Cement
* Inner Walls : According to customer preference,
- Drywall coating, finishing with water-based paint
-Wood veneer
* Ceilings : According to customer preference,
- Drywall coating, finishing with water-based paint
-Wood veneer
* Floors : Room floor is laminated parquet, other floors are tiled.
* Window : PVC profile, white color joinery. Color options are optional.
* Entrance door : Wooden material solid door.
* Interior doors : Panel door.
* WC-Bathroom Space : Shower tray, shower cabin, half-pedestal washbasin, bathroom cabinet, floor-standing toilet..products are included in the package.
* Kitchen Space : Mdflam material kitchen cabinet, steel sink, marble countertop are included in the package. Other requests are optional.
* Indoor installation : Electricity, water installation is included in the package. Air conditioning and, upon request, heating installation are optionally available.
* End elements : Electric and water end elements are offered in the package scope.
* Heating : Solid fuel stove or fireplace. Fireplace boiler is optionally available upon request for a fireplace.
* Excluded from the package : White goods, sitting groups, wardrobes, coat racks, bed bases, bedsteads, etc. are excluded.
INFRASTRUCTURE
* Water : It is accepted that there is a network (it has been brought to the base area). A sufficient amount of water tank will be offered optionally for places where there is no network.
* Waste water : It has been accepted that there is a sewer line (installed between the foundation-line). In places where there is no sewerage infrastructure, a septic tank will be offered as an option.
* Energy : It is accepted that there is an energy line (it was brought to the foundation site). For non-existent places, solar-wind-generator solutions will be offered optionally.
RECONSTRUCTION
TAKS value will be obeyed.
PROJECT-FOLLOW
* Project : Foreground-projects will be prepared within our company and submitted to the approval of the Customer. Turning the accepted plans into a Project (Architectural-Static-Electrical-Mechanical Installation) and submitting them to the institution are included in the scope of the package.
* Follow-up : Municipality-other Institution follow-up will be done by our company.
* Institutional payments : All licenses and payments to Institutions will be made by the Customer .
Share











